Preparing for the PMP

PMP
PMP
This post is based on an interview with Piyush Singhal who cleared PMP recently with a 90+ score.

Okay, so you are thinking about going for the Project Management Practitioner exam, and do not know where to start. Let’s get you started. Below is a project plan for clearing the PMP certification.

The first thing to do, is to obtain PMI membership. This might get you the PMBOK guide (Project Management Body of Knowledge) bundled. In addition, you get a discount on the exam fee and access to all PMI resources online for one year. You may also join a local chapter of PMI.

When he set out on operation PMP, he realised it would not be possible for him to read the entire PMBOK. So, he decided to use audio books for this purpose, and installed them onto his car audio that he could listen to while travelling. These are available from pmprepcast.com. He spent about six months listening to these, around 5 hours a week.

At this time, he tried to assess himself. There are PMP-like sample tests available on various websites. Working through multiple tests in simulation mode gives you an idea of how you are placed against the real one. You can take these four hour tests, always keeping the formula cheat sheet on hand.

For the last lap, he accepted three week solitary confinement. Leave from office, away from family, away from TV: reading about eight to ten hours a day. Then he decided he had had enough, woke up one morning – and appeared for the test. Sounds easy, doesn’t it?

Share

Project Managers: Know about Conway’s Law?

From Wikipedia, available under license as detailed here: http://creativecommons.org/licenses/by-sa/3.0/:

Consider a large system S that the government wants to build. The government hires company X to build system S. Say company X has three engineering groups, E1, E2, and E3, that participate in the project. Conway’s law suggests that it is likely that the resultant system will consist of 3 major subsystems (S1, S2, S3), each built by one of the engineering groups. More importantly, the resultant interfaces between the subsystems (S1-S2, S1-S3, etc) will reflect the quality and nature of the real-world interpersonal communications between the respective engineering groups (E1-E2, E1-E3, etc).

Another example: Consider a two-person team of software engineers, A and B. Say A designs and codes a software class X. Later, the team discovers that class X needs some new features. If A adds the features, A is likely to simply expand X to include the new features. If B adds the new features, B may be afraid of breaking X, and so instead will create a new derived class X2 that inherits X’s features, and puts the new features in X2. So, in this example, the final design is a reflection of who implemented the functionality.

Law
Law

A real life example: NASA’s Mars Climate Orbiter crashed because one team used United States customary units (e.g., inches, feet and pounds) while the other used metric units for a key spacecraft operation. This information was critical to the maneuvers required to place the spacecraft in the proper Mars orbit. “People sometimes make errors,” said Dr. Edward Weiler, NASA’s Associate Administrator for Space Science. “The problem here was not the error, it was the failure of NASA’s systems engineering, and the checks and balances in our processes to detect the error. That’s why we lost the spacecraft.”

Share

Needle in Haystack Part II – the solution

Needled
Needled

Okay so we have faced the problem. What do we do?

It may be prudent, to obtain bye-in from the person who will be looking for the needle in the haystack. Especially if this is a boring task you will need to explain to the person why it is necessary to find the needle and how it fits in with the vision/mission.

In case this is a repetitive scenario, you may want to track how many times each resource has failed to find the needle and penalize the one at the top. If this specific scenario is not repetitive you may want to club with similar scenarios where the group overall is repetitive. This can also be subjected to statistical analysis (more on the statistical analysis in another post here).

One way, as I suggested earlier, is to create a verification procedure that is shorter than looking for the needle in the haystack itself. Ask a peer to carry out the verification – call him the “supervisor” (he will be better motivated this way).

Another way to handle this problem is through the usual reward/punishment strategy. Either offer a reward for finding it, or offer a punishment for not finding it. The reward does not have to big, neither does the punishment need to be huge. Token punishments are enough. For example, a task required everyone to fill up a template, and one person to consolidate each Friday. People would need reminders, etc – so we decided that whoever is the defaulter the highest number of times would get the task of consolidating for the next few weeks. Then on to the next defaulter.

Share

Needle in Haystack Part I – the problem

Needle in Haystack
Needle in Haystack?

One of the problems I have faced repeatedly in not just project management but in a wide variety of scenarios (even at home) is what I call the ‘Needle in Haystack’ problem. Say I am the manager of a project where the task is to find a needle in a haystack. I assign the task to Mr.X. He comes back after three days and tells me there is no needle in there. I am confronted with three possibilities:

  1. He actually spent three days actively looking for the needle and was unable to find it. There is indeed no needle in there.
  2. He actually spent three days actively looking for the needle and was unable to find it. There is a needle there, only he was unable to find it (the methods may be not very efficient for example).
  3. Mr.X went on a movie watching spree πŸ™‚

The real problem here however, is that in order to find out which of the scenario is factual, I will have to find the needle myself – and maybe spend three days myself. There is no benefit obtained through delegation.

One course of action, obviously, is to seek evidence from Mr. X. A bus ticket from office to the haystack for example.
Another is to find a way to verify if there is a needle or not, in say 3 hours. In most cases one of these solutions is possible, but is hard to find. In the next few postings on this topic I will share case studies around this, to give you some ideas around it. There is no magic wand though, everyone needs to invest thought.

All postings in this series will be accessible through this link: http://blog.2cent.me/tag/ndlinhstk

Share

Top 10 considerations when preparing a software test plan

testing

Click on images to enlarge

-> Test the parts of the application that have changed since the last cycle / go live

This part of the test plan is very obvious: test the changes to the application. Each change needs to be tested individually if possible, or as groups if the number of changes is large, and is known by the name regression testing.

For example, if you added a new field called ‘maximum pay by date’ to the voucher batch interface, then you could test the interface for this – having both data with this date entered, and with this date set to blank.

There is nothing more to this one – its normally the facet of testing that does receive the due focus during testing.

-> Test sampled parts of the application that have NOT changed

Now we come to something that does NOT receive the due focus. The parts of the application that remained unchanged. No, you do not have to test ALL if it. If you can test all of the application (especially with automated tools, as discussed below) – nothing like it. However, at least test 10-15% of functionality that has not changed.

For example – as discussed above – if you changed the voucher batch interface, then you can test the online voucher entry. Under the online voucher entry, test at least one scenario that has not changed.

The rule of the thumb is that if in a module having 100 test cases, 40 have changed – then test those 40 that have changed, and test 6-10 of those 60 that have not changed.

-> Look at it from the end users perspective: do one full cycle end to end

Next to include in the plan is something you can call integration testing: if your application is about users entering vouchers and getting paid – perform this cycle as a user would do. Many times we IT folks test only our application – the one we are developing and forget the rest of the glue technology. It falls into the category where we want to do it, yet are lazy at – so we find some short-cuts.

Once I was asked to carry out testing for a reconciliation report that had already been tested by the developers. I uploaded the same input twice, which ended up showing double on the final report. It turned out that the developer had missed this because he tested only on the basis of data that already existed in the system, and did not upload any new vouchers.

-> Stress testing

stress testing

Stress testing should again be a very critical part of your test plan. How many users are expected to use the application? during normal hours? during peak hours? Plan for all such scenarios. Design the business process that would take place if the application does fail – the idea should be that the user’s work doesn’t get halted.

There are stress testing tools available both free and commercial that you can use to simulate users.

In one of my projects, a web application that was created for 800 users, failed under a load of 35. Increasing the number of processors, or the number of server boxes is not a guaranteed way of handling load on the application: the application has to be designed to support the load from the ground up, and tested suitably.

-> Performance testing

performance testing

How long does a file take to get processed? How long does the user expect it to take? How long it takes for the screen to open/save?

The user expectation part is sometimes ignored. Please go ask the users of your application now what their expectation is – or it might already be too late in terms of coding.

The developers might think if a process runs for one hour its good enough. However, the users might be needing to run it six times a day during the closing period. Hence one hour might not be fast enough. In such a scenario we had to run four parallel instances of a process to achieve the user specified timing.

-> Concurrency testing

Can two different instances of the new process run together? The panel you just created: can it be used by two persons at the same time? Does it cause deadlocks at the database level if 100 instances of the process are run together?

Can two different versions of the application exist on the same machine?

These are the kind of questions that you ask yourself while working on the ‘concurrency’ aspect of test plan/execution.

A team of developers once needed to clone a process, and create slightly different functionality. However, it turned out that when both the processes were run together, 1 times in 10, one of the processes would fail. This was noted after go live πŸ™‚ Turned out the cause was incorrect use of the shared temporary tables by one of the processes.

If you are interested in Deadlocks technically please read my posting: “Oracle Deadlocks: the What & the How“.

-> Unit test before Integration testing

Our laziness at work again: we ‘trust’ our work and want to move directly to integration testing. Partially, the waterfall model of software development is also to blame here.

99% of the times, after the developer moves directly to integration testing – the very first test case for the application fails, and the developer comes back to the unit testing phase. πŸ™‚

Unit testing is a very critical part of your test plan – if you do it right, you will find hundreds of issues that will otherwise never get detected. Even not during integration testing.

Build ‘driver modules’ to iterate through all the ‘ifs and whiles’ that have been coded. Try out all avenues control can flow through.

-> Create test history

Creation of a test history is as important as doing the testing. Being able to, at a later date, answer such questions as: ‘what are cases we tested?’, ‘what are the problems we found?‘ etc is very helpful. Showing a clean slate (a ‘pass’ on all test cases) at the end of all our test iterations is not so helpful. In short, record the problems found, even though they may get corrected later on.

-> Automated testing

Automated testing solutions can be a big help. It does not mean that all testing be delegated to the automated testing mechanism: but it can definitely be an add-on to your manual testing.
In changing the order entry functionality, use it to enter 1000 different orders. There are several solutions available (use google) that will record the user actions, and will repeat those actions later with different data.
At a very simple level, AutoIt is a great tool for automated data entry, and is free (GPL). Its very flexible and has a great library of functions built into its scripting language. I use it all the time, and not just for testing!

-> Code review

While we focus on all these great ways of testing let us not forget our tried and tested workhorse: code review. Being humans, we are tempted to feel that by doing better testing (being easier to do) we can offset the need for a good code review, but there are hundreds of reasons to do code review.
There may be some program flows designed for rare situations which may never get tested. Code review in such a case will contribute ideas for such test cases. Documentation may not be in sync with the code, with the potential to make future changes difficult. There may be code improvements possible: for example, replacing an ‘if condition’ with a more specific check.

There are other things, depending on your scope you may also want to include them:

-> Knowledge transfer/competence testing

-> Backup & recovery testing

All the best, post your comments here.